roofing Installation Process
 
House is draped to help prevent any damage to side walls during stripping process
Shingles are carefully removed from roof deck
Flashing around dormers, side walls, etc. are inspected and cleared of all roofing debris and prepared for new shingles
New vent boots are installed whenever possible and roof deck cleaned of all nails and inspected for loose boards
Roofing materials are brought to work area
Metal drip edge 8” wide is applied to all edges to help prevent water backup and support edge of new shingles
Leak barrier is applied along all eaves lines 3’ wide
Roofing shingles are applied over leak barrier
Roof deck protection is applied over remaining wood deck
 