ROOFING INSTALLATION PROCESS


House is draped to help prevent any damage to side walls during stripping process

Shingles are carefully removed from roof deck

Flashing around dormers, side walls, etc. are inspected and cleared of all roofing debris and prepared for new shingles

New vent boots are installed whenever possible and roof deck cleaned of all nails and inspected for loose boards

Roofing materials are brought to work area

Metal drip edge 8” wide is applied to all edges to help prevent water backup and support edge of new shingles

Leak barrier is applied along all eaves lines 3’ wide

Roofing shingles are applied over leak barrier

Roof deck protection is applied over remaining wood deck